---
title: "work breakdown structure"
description: " An arrangement of work elements and their relationship to each other and to the end product. "
type: term
term_id: 638
language: English
language_code: gb
canonical: "https://glossary.istqb.org/en/term/work-breakdown-structure-7"
slug: "work-breakdown-structure"
url: "https://istqb-glossary.page/work-breakdown-structure/"
---

# work breakdown structure

 An arrangement of work elements and their relationship to each other and to the end product. 

## Present in syllabi


- Advanced Test Manager 2012
- Expert Test Management 2011

## Translations


- [Deutsch](https://istqb-glossary.page/de/projektstrukturplan/) — Projektstrukturplan
- [Italiano](https://istqb-glossary.page/it/work-breakdown-structure/) — work breakdown structure
- [Português (Brasil)](https://istqb-glossary.page/br/estrutura-analitica-de-projeto/) — Estrutura Analítica de Projeto
- [Português](https://istqb-glossary.page/pt/work-breakdown-structure/) — Work Breakdown Structure
- [Svenska](https://istqb-glossary.page/se/arbetsstruktur/) — arbetsstruktur
- [Svenska](https://istqb-glossary.page/se/work-breakdown-structure/) — work breakdown structure

Read this term online: https://istqb-glossary.page/work-breakdown-structure/

Markdown variant of the HTML page at https://istqb-glossary.page/work-breakdown-structure/ — part of the
ISTQB Glossary (https://istqb-glossary.page), a linkable, machine-readable
republication of the ISTQB glossary under fair use. No affiliation with ISTQB.
